Tuesday, August 31, 2010

Working together?

Are you designing for people who work within a structured organizational reporting chart, are you designing for a group that works as a team, or are you designing for Stars, a person with an individual following and lots of staff to support them?
Some stars ban together for the purposes of insurance, image and 401K plans.

How does work get done in is this company?

Designing for the Stars is quite interesting and exciting.
Designing a space for an engineering company, a limited liability partnership is interesting. The challenge –
The outside Image--- look like one company.
The internal Image and workings are more individual.

There are four equal bosses (it is, after all, a partnership).
Each boss has their own dedicated staff and has an opinion about everything.
They have opinions and attitude about furniture, wall treatment, floor treatment and the overall look. Ultimately, it is the color scheme that holds it all together. Each individual private office has its own design, workspace,furniture and color scheme but the image of the entire office is tied together by a fabulous carpet.

Friday, August 27, 2010

Change - too much?

How much change is too much?

I designed the interior of an office in NYC. It was in an established building (definition - a great location but some of the 36 floors were dated. So dated that a "hazmat” team was invited to remove the VAT tile still on the floor we were vacating.)

The new space was located on a different floor than the organization currently occupied, it was consolidating. They wanted to update their work area as part of the relocation. It looked lovely when it was finished, warm, inviting, very professional but not too high end.

Everyone still occupied private spaces, but with window treatments, pictures on the walls and new but not expensive furniture. The office had a coordinated color scheme and it visually flowed from one area to another. It was a not for profit organization. It had to look good but not too good.

However, a day or two after move in , one of the employees said:
“I don’t know if I can work here any more, I need better clothes”. The creeping FUD again. (FUD – Fear Uncertainty and Doubt)

Does the design of an office dictate the type of clothes worn to work? Or the quality?

Tuesday, August 24, 2010

Design Concept FUD

Another question for an Office Design Concept

Where are they going ? What are the space opportunities and constraints?


Mental weeding is my topic today. That relates to an office design concept how?
The creeping FUD, enters all projects. Fear, uncertainty and doubt. We need to pull the weeds out of our mind and out of our design concepts.

We need to ask more questions.

Were are they going? It is an internal move or an external move?

1. Are they relocating across the hall and the design concept needs to reflect the existing workings of the space.
Or
2. Are they relocating to another city, a new space and the organization is looking for new concept of working.

Design a workable space. ha - easier said than done.

I designed an office space using a new concept for an old and established company. The organization wanted a more open, more transparent relationship among the customer service staff. The president thought they needed to communicate more and more easily.

We choose a very open, low partitioned workspace. We previewed the concept with the whole office. We conducted a two hour presentation and town hall meeting, with the president speaking about how important it was to have good communication. He was an integral part of the change.

It all was great until ... the new concept (furniture) was installed and people moved into their new space.
– There was an up roar by the workers
– Within a year, high partitions were installed. The space was again, cluttered, private and not pretty. A breakdown in communication.
–
– How did the creeping FUD change this concept and whose FUD was it?
– What is the solution?

Friday, August 13, 2010

Office Design Concept

5 Questions for an Office Design Concept to be developed.

1. What are we trying to accomplish? ( see previous blog)

2. Where are they going ? Space opportunities and constraints.
Why are they going?

3. Who is being relocated?
4. How are they going to work together?
5. When does the concept need to be approved and by whom?

Where are they going? Why are they going?

In developing a concept a good “need” to know is why are they moving?

1. Financial – Got a better deal and the cost to move is less than the cost to stay.
This is a rare occurrence. But with less expensive sq. ft. cost, companies are moving to lovely locations that cost less per square foot. The decision maker here is the actual cost to move the phones, computers and furniture. More importantly, will there be any down time? Will there be a lost production cost?

2. Reducing the size of the occupied square feet - It is an easier decision for a large corporation than for a small company. Every move is a cost money thing to do. The financial impact on a small company is greater. A larger company may have unoccupied square feet available for use. This is usually a tension filled atmosphere with slings and arrows flying thru the air. Grumpiness prevails for good reason. People know that someone is being laid off but no one knows who.

3. Increase the size of the occupied square feet – A growing organization has a very positive attitude to the changes about to happen. More room to work and more people to help get the job done.

What does the design concept have to do with why they are moving or where?

It is all based on relationships. The physical relationship of the individual to the work that is being done; the amount of space required to do the work, the communication required for the work, both thru one on one conversation or on line.

For example: If the concept is to encourage the Research and Development and to encourage the exchange of ideas frequently,. an open office space might be the solution.. This would be especially true if each person were in a ceiling high office.

Brainstorming how the company will function in the new space and understanding why they are moving will provide key insights into the design concept.

Love this part of the job, it is exciting and fun. Creativity abounds with the possibilities, stones are turned over and old concepts tossed. It is fresh invigorating and helps an organization reinvent themselves and their operating procedures.

Monday, August 9, 2010

Design Concept

The basics.

What are we trying to accomplish?.. Three possibilities.

1. Stay the same – duplicate exactly the layout, office size, travel communication paths, size of offices, and maintain the physical relationships currently in place. The location maybe on a different floor or in different building altogether.

2. Become economically efficient - Reduce the size of the space, remove redundancies and streamline travel communication paths. Reduce the size of the ceiling high offices and reduce the size of the workspaces where appropriate. Spending less on office space is a priority in this concept.

3. Become modestly and generously efficient. Cost per person for office space is always a consideration. Conference rooms and meeting areas to accommodate a location to share ideas, add a cost but, also provide a modest and generous atmosphere for the birth of new products and efficiencies. Travel paths are numerous providing people with easy access to each other. .

The design concept will reflect the ideas, attitudes and strategies of management.

The LRF Design Group works with companies to make them more effecient and therefore more profitable. The design concept is a good place to start..

Thursday, July 29, 2010

Programming a workspace

Programming an office space? It sounds like what you do to your TV recording device, In a way it is!

What do you want to see?
What time is it on ?
How far in the future are you recording?

For programming your office, it is the same.
What do you want to see? - What functions need to be performed in your office?
When is the program on? – How many square feet do you occupy?
How far in the future are you planning?? Where will your company be in 3 - 5 years?

Gathering information to program an office space requires good questions.
Our first question was determining the number of people.

Quest # 2 is – How much space does each individual person/job description/task require in order to do the work?

Sometimes, a tape measure is needed to answer this question.

In a large corporation, each individual workstation has a square foot, a foot print – i.e. each person has a 6X8 cubicle. 48 aq. Ft. of space.

In a small company, - more likely it is a desk, a chair, two filing cabinets, a side chair, a storage cabinet. For this you need a tape measure is required – legal or letter filing, a desk from IKEA is a different size than a desk from Staples. Draw a small sketch of the space to account for the equipment and for people to access desks, chairs and filing cabinet.

For accessibility, measure how much space is needed to use the equipment. For instance, how much space do you need to pull the draw open of the filing cabinet plus the space of the person standing next to or in front of it. A 14” by 30” filing cabinet, requires almost 30” to pull the drawer open to reach the files in the back, plus the person working in the file drawer. 14”x 60” plus 24” for a person. The numbers start escalating.

For the "do it" yourselfers – sketch it out, draw a work station on graph paper for each person and work area.

Saturday, July 24, 2010

Office space - how much?

Programming office space - Part 1

If you ask a potential client “how much space do you think you need?”, the answers are fun.
They range from “not much” to about the size of “this room”.
Doesn’t matter where you are sitting – the comparisons are always made to your current location.
As a designer, you carefully examine where you are and mentally calculate the square footage of your surroundings. Depending on the adjective used, you double the space, add half again as much or cut it in half. Your potential client, although thoughtfully looking around, doesn’t have a clue about the actual space being needed in their new environment.

How do we get to the real square feet?

Step one: Ask good questions – get you client thinking. They will soon be aware that they need you to convert all these questions in to the number of square feet of useable/ rentable space.they need

Question 1 – “How many people will be occupying the new space”. I love asking this question “.
12 people seems to be the mental anguish point. . Under twelve, the answers start physically. With one full hand open, the person responding often holds each individual finger while naming people.. It is as if each finger has a new name and title. As the fingers are consumed with names, a paper and pencil emerges.
It is curious that under 15 people the actual job function (job description) or job title is rarely mentioned.

At about 15 people, the organizational chart is pulled from a desk and job titles are discussed with numbers of people now and in the future. A workstation requirement for a person, who has a job function or title, is so much easier to determine.

There is an interesting management lesson to be learned by observing this scenario.

12 – 15 people can be managed with attention to the person, how they function and how they contribute to the overall department or company. A synergistic relationship.

Over 15 … it’s an accounting function. A necessary accounting function for large companies.

This in only part one.

Monday, July 19, 2010

Trustworthy

Got off on a Trust tangent.

Commercial Real Estate/commercial furnishings is an industry as rampant with circling sharks as is the industry of Insurance. I referenced, Todd Welch and his effort to recognize and promote working with people you trust, in a recent blog.

Having the tools to do the job right and having a trust worthy team, will carry you thru to the end of your project safely. Safely defined as “being on time and with budget”. You too, can have a Smooth Move without being devoured by the sharks.

The “how tos” of a Smooth Move will continue as we delve into each task; giving you the information you need to make good, solid and wise choices.

Friday, July 9, 2010

On time and within budget

Moving a commercial space is complex.

Here’s the challenge

• Must be On time - - Telephone, computers, furniture and equipment – all scheduled to be in place and working at 8:00 am. the Monday after the weekend move. (everything is tested a day or two before). The telephone cross over is always a challenge.

• Must be Within Budget – after the movers, desks, chairs, carpet, wall coverings, paint, minor items and Murphy, are all accounted and within the planned expense, you're good!

There is no budget for wandering workers without a workspace.


Hope is not a strategy! Hire a design firm to increase productivity, profitability, and experience in your type of business.

Plan the work … work the plan, and the new space will work for you.

Tuesday, July 6, 2010

Carpet care

I love this! Bigelow is basically telling you that if you take good care of your carpet you won’t have to purchase new carpeting for years. Not a good business strategy, people need to buy more carpet. it keeps the economy moving.

From a customer appreciation standpoint ... brilliant.

When I worked at Blue Cross and Blue Shield of NJ, the carpet specification standard was Bigelow. That’s when I became a fan! The carpeting in the elevator lobby looked fabulous and it was installed 20 years before.

Here are their 5 tips to take care of your carpet. Check out the link, the specifics are there.

1. Dirt is everywhere, keeping it out of the building is easier and less expensive than removing it.

2. Vacuuming regularly is part of any maintenance program (how to’s included)

3. Spots are inevitable but they don’t have to be permanent (how to’s included)

4. Interim Cleaning - Scheduled pile lifting, vacuuming, spot removal and low moisture cleaning can help the carpet retain appearance and improve performance

5. Restorative Deep Cleaning. .No matter how conscientiously you work at it regularly scheduled maintenance will still leave some soil behind. Periodic deep cleaning, using hot water extraction, is most effective at removing any embedded abrasive soil.


Bigelow’s Commercial Carpet Care and Maintenance Guide is simple and elegant. A good reminder. It is available free on line at

http://www.themohawkgroup.com/sitefiles/PDFs/carpet_care.pdf

Thank you Bigelow!

Saturday, July 3, 2010

Keeping it green

Keeping it green doesn't take as much work as we thought.

http://www.interiordesign.net/blog/Design_Green/34485-Tandus_and_Antron_Old_Is_Green.php

Friday, July 2, 2010

Office Flooring Standards

Floor finishes - perfect to be standardized for workspaces.

By taking the decision making our of floor finishes for a new office, you save time and money.

The objective is to relocate people into new or renovated space and not have it be a series of major decision again. A decision about branding your company and space, or who likes what color, or which carpet will show the least amount of dirt is very time consuming.

Standardizing is about getting the new locations up and running, as quickly as possible, with the least amount of effort.
Relocation comes with enough barriers to success, keeping floor finishes out of the mix every single time you relocate your office or department adds a stability to the process and to your organization.

The floor finish decisions should be made during the initial branding/image of your building or your office space. Decisions about color, pattern, weight, durability, warranties and availability are complex issues with financial consequences. Select the product that most reflects your need in terms of use. When one of these criteria change, a new decision about flooring needs to be made. If you have set the standards, the decision making is easier.

Establishing the standards for your business, as early as possible as you grow and change, the ready information will save you time and money.

Monday, June 28, 2010

Office Relocation: Same ole ... same ole?

Moves are easy - if everyone is moving into the same exact size office with the exact same furniture and the furniture is located in the exact same spot as before..

Easy!

For some reason, whether the office spaces are exactly the same or the spaces are completely different, it still takes people the same amount of time to adjust.

Easy ? At least, it seems easy.

Moving into a new space that looks like the old space, and thinking you know where everything goes, does take a little bit of stress off the relocation.

It will still take a minimum of 6 boxes of packing and several hours to get all your stuff contained. Then, there’s the unpacking. It will take several more hours of personal installation.

Taking pictures of how your drawers are set up, helps to get items back into the exact same place. If we don’t put things back exactly as they were, our habits will cause frustration.

On a busy day, if we are looking for that one item … that was always in that one specific spot and it's not there!

Was it re located during the move?. Probably….
It will drive you bonkers!!

Helpful hint
Plan your personal move
Will this move be same ole, same ole? … if so take pictures.
If you are going to reorganize your workspace, plan it!.

Saturday, June 26, 2010

Office standards and Turkey Dinner

Office Standard sizes are consistent, predicable and safe.

Long before I heard about office standards, I applied for a job as an Interior Designer at BC BS. I couldn’t understand why they had placed an ad for an interior designer, they were an insurance company.

They didn’t really … No one was answering the ad for a “ Construction Communication Coordinator”. An Interior Designer was the next best thing. They ran to see if anyone would show up.

I did. I had been working for a furniture dealership, a pretty yucky job. But the furniture dealership was selling the same furniture system that BCBS used..

I was hired for two reasons, I knew how to specify the furniture system at BCBS to create the size offices they needed, and I could cook a turkey dinner on time.

A turkey dinner ?

Bringing a furniture relocation project on time and within budget is much like cooking a turkey dinner.
It is consistent ... Office sizes are the same … Menu is easy to live with.
Predicable ... The project ready for occupancy by Monday am is equal to a Dinner Served hot by 4:00 pm
Safe ... Nothing unusual here. Same ole Same ole. Everyone moves in …. Every eats dinner.

The surprise for me? Didn’t know I was going to love doing it so much.

Wednesday, June 23, 2010

Why bother with office standards?

Who cares about standards or office size, furniture selection or finishes. You’d be surprised! .

When an office relocation requires newly build spaces, Rising Star corporate executives care and they care a lot!

When my rising star client, who seemed to be a very nice man, measured the square footage of his newly built office, (during one of those after hour experiences), he had a hissy fit. Screaming and yelling like nothing most of us see.

Why? He was missing 5 square feet. He perceived that with less square feet, his stature in the company was reduced. He would have the same square feet as his direct report. In this company, it was important and it was noticed.

The contractor? He was trying to reduce the cost of the changes. Reusing an existing wall only 6” away from the new one made sense to this very cost conscious vendor. The company had developed a man who was very supportive of their thrifty budget and because of his success at saving money, he was rewarded with a long term contract . He could save big $ for the company by not having to change the adjoining office’s carpet, ceiling or hvac distribution. A decision the contactor thought helped the company. It would have helped the company but not the rising star.

Everything was rebuilt.

Hint: Ask first?

Monday, June 21, 2010

Office Move Plans

What! Office Move plans have expanded! I was so surprised when I hear this that I remember all the details.

It was May 20th (my birth date so that helped the memory) I was walking with a Real Estate Maven on 42nd street, near Grand Central, in NYC. It was a nice sunny day, I was hurrying to get back to the office to finish up for a B D celebration. But, this statement stopped me in my tracks.

His comment was casual chatter, as we strode back to the parking garage. To him it was an “aside”, to me it was larcenous.

He said “You know they’ve been calculating office space by measuring into the sidewalk. Keeps the per square foot cost down.”

“What ? Are you kidding?” I screamed. “No, I’m not kidding” he said.
Sarcastically, I mused “I’ll bet it keeps the cost per square foot down!”.

Lots of questions immerge. How do you determine your actual square feet?. Your usable square feet plus the common area square feet? .What “truths” do the landlord and the tenant have in common, what do they use as an accurate document?

When an outrageous concept like this happens for us purests, it changes “the reality”. An in creased cost for the tenant occurs. He has to hire someone to field measure the space (which he should do anyway), He needs an accurate document with usable square feet. In this case, common area costs just rose expoentially, for each department! But,the per sq.ft. cost is lower, claims the RE Maven, it all works out in the end he claims. Or does it?

“As built” drawings are used to identify the number of square feet in a lease agreement. It is a legal document!

Never a dull moment in the business of facilities management and office relocation.

Saturday, June 19, 2010

"As Built" Drawings for Cost Center Accounting

Cost center accounting using a hand drawn plan is a horror show experience. Back in the day before computers, using 1/8 scale drawing of a 150,000 square foot building and outlining the departments with a thick colored pencil, you could lose 30 square feet in a heart beat. Then it would take you all night to find it. This search and rescue mission was an absolute must before the end of the quarter, before the end of the last day, before the last hour, of the last minute; found always a hair before midnight.

For some reason, the balancing of a million square feet of office space to the satisfaction of the accounting department always happens on a Friday afternoon; usually a in the dead of winter. The numbers never seem to add up, or a department would be lost. The department was usually a small, two person relocation; that happened at midnight.

Definition of a Midnight move – no one was supposed to know they were relocated for what ever reason. So we cloaked them in the stealth technology of the day, “midnight” and moved them. It was a secret. Now we can’t find them, it was a secret! Now they are MIA. Crap!

“As built” drawings are used to calculate the square footage for each cost center. Every company wants to know how much it costs for each person to sit in their assigned space.

Friday, June 18, 2010

As Built Drawings " Why"

There are three uses for “as built” drawings; as space allocation plans, Cost Center plans and actual usable square footage plans.

“As built” drawings are used to create space allocation plans when a company is considering how to use the space in a new building.

These are the what department is going to sit where plans. Usually colorfully created, it is a simple birds eye view of the possibilities.

Sometimes the facilities department in company wants to see actuals The beginning of a migration. Departments are alive, they expanded and contract. They are on the move.

Thursday, June 17, 2010

In Situ - the office building

My heart goes pitter pat at the opportunity to walk a new building.
There is something magical about a concrete floor, exposed columns, I-beams and miles of wire hanging out like a clothes line ready for wash.

This space needs occupants, activity. We are a long way from moving people in. Our first step: field measure the space.

An office relocation requires a floor plan of the walls, columns, windows and heating ducts. Anything that takes up floor space. . Duh!
But field measuring the building for the office move is a challenge.
Taking pictures of the space, as you are work, is a great reminder.

Field measuring this is like another archeological dig.

Consistency and a methodology are good friends when gathering information.
Accurate drawings of the new office building are key to a beautifully, profitably designed office and a ultimately a successful move.

Here are 5 Steps to saving time in developing an accurate floor plan..

1. Begin with a blue print or a floor plan supplied by the building owner or sketch out your own plan first. This way you won’t miss anything in the heat of the measurements.

2. Take overall measurements of the space. The measurement should be to the (¼“) one quarter inch. No matter how long and wide the space is, have the overall number. This is not an estimate or a guess, it is a north to south and east to west measurement. The answers to these two measurements are your proof, just like in elementary school.

3. Start by measuring in one spot and working your way all around the room until you are back in the same spot.

4. Measure the wall thicknesses, locate the floor mounted heating units and other floor occupied items like “dog houses” (floor mounted utility boxes)

5. When finished, addup the individual room measurements, they should match your overall measurements. If they don’t match, analyze the information eek don't remeasure. Check for the inconsistency? Did you measure from center line or from the exterior of a column? or both?

Still not measuring up? - Check where you began your measurements.
Did you measure from wall to wall? Or from heating duct to heating duct.?
Did you begin at a window or did you begin at the wall.
Check for wall thicknesses, and column inconsistencies. One space had a double wall built, another a sheet of lead installed both for privacy. Both that increased the thickness of the wall and we lost a few inches. Sometimes columns have roof drains nestled in the i beams which makes them look the same but not measure the same.

I don’t know why, but it always seems to be a hazy, hot and humid inside the building when I’m measuring. Take your time, bring lots of water to drink and be patient. You don’t want to have to come back.

Lesson two: It is what it is!

Check out www.lrfdesigngroup.com

Wednesday, June 16, 2010

The Office Dig

The start of an office relocation project is like being on an archeological dig.

My experience on a dig in Tel Gerisha in Isreal was similar. We awoke every morning at 5:30am to coffee, rye bread, a Nutella spread and a day promising to be very, very hot. We pick axed, shoveled and moved the filtered dirt in a wheel barrow over the side of the cliff. When we had dug down about foot from the day before, the archeologist would stop by and write a creative story about what may have happened in this specific spot. Then yet another archeologist would stop by to draw exactly what was now revealed, as a result of our digging.

Researching how a company functions is the same. We start early and get to know the people involved, we share coffee and gather information. We throw out was is irrelevant. We dig a little more. We ask questions about the difference between the organizational chart story and the real story.

We ask to hear the story about how the paper and/or information really flows through the company. We ask, "Who are the real leaders." "Who needs to approve the drawing?", even through they are without the titles? We write our own organizational chart. We reveal a different story.

Merging the “what is” story with the “ideal picture” story, we are able to help a company function more effectively and more profitably.

Lesson two: Stories can be a bit creative.

Monday, June 14, 2010

Move Day

The empty new building, we were about to occupy, had an unusual observer. It was the VP of Public Relations. It is move day. We’ve moving 100 people, equipment and boxes. On this Sat. morning, the 18 wheeler moving trucks were circling the building like conestoga wagons looking for a place to park. The movers were ready for the first truck to park holding hand trucks, blankets and skids. The opening bell was about to ring for a very long, sweaty and intense day.

As we were unloading ,“Mr”. Public Relations demanded that his office be the first to be set up. Of course, he hadn’t mentioned this need anytime during the previous three months, during any of our weekly planning sessions or even three days before this move day, nor during our last minute “walk thru” to go over our move check list..

What!!!…. was this guy kidding! Not a chance ! We couldn't find his furniture let alone install it..

I wish I could have tweaked my nose and made it happen. He seemed to be a nice guy during our “before move day” meetings. But as sometimes happens during stress ridden events, an alien emerges. A stranger was standing in front of me screaming. “ I want my office now!” “I have to go out of town” scream Scream SCREAM!!!

Murphy always shows up during these circumstances. His furniture was the last to be removed from the truck. He was quite happy when his furniture was the first to be put on the truck.

By Sunday afternoon, all the furniture, equipment and boxes were in place, ready for occupancy on Monday morning at 8:00 am. Just like we said…“ You’ll be ready for “business as usually” on Monday Morning.”

Move Lesson: First in Last out!